GEO5 Software

Online Hilfe

Tree
Settings
Programm:
Sprache:

Projekt

The frame "Project" is used to input basic project data and to specify overall settings of the analysis run. The frame contains an input form to introduce the basic data about the analyzed task, i.e. project information, project description, date, etc. This information is further used in text and graphical outputs.

In this input mode, the assumed setting can be modified only in the first construction stage. The frame also allows user to switch analysis units (metric / imperial). Project data can be copied within all GEO5 programs using "GeoClipboard".

Frame "Project"

Testen Sie die GEO5 Software selbst.
Laden Sie die kostenlose Demoversion herunter.