GEO5 Software

Online Hilfe

Tree
Settings
Programm:
Sprache:

Verification According to the Safety Factor

The verification analysis according to the factor of safety is selected in the "Pile CPT" tab. This frame also allows us to define the required factor of safety for bearing capacity. Pile verification then assumes the form:

where:

Fs,d

-

pile load

SFb

-

safety factor for bearing capacity

Fr,d

-

pile bearing capacity

Testen Sie die GEO5 Software selbst.
Laden Sie die kostenlose Demoversion herunter.